The maximum allowable cost for the project is 10 lakhs plus working capital, which cannot exceed 25% of the total cost.
Banks should consider composite loans rather than term loans to meet working capital requirements. This is in addition to the recommended limit of Rs.10 lakhs.
The subsidy, on the other hand, will be computed without taking into account the working capital component.
Beneficiary contribution of 5% of total project cost.